Centennial Centre Expansion and new Aquatic Facility PDF Print E-mail

On behalf of the Members of Council and Staff, it gives me great pleasure to welcome you to the website for our Project known as the Centennial Centre Expansion & new Aquatic Facility.

 

This website will keep residents and visitors updated on the progress of the Project.  Council encourages you to visit this site regularly and share in the excitement as the design starts to take shape and the planning for construction begins.  Watch our new facility take shape!

 

Please use the contact and comment opportunity to provide the Building Committee with your comments.

 

Thank you.

Mayor John Klinck

 

For more updates and information on this important community project, please visit the links below.

 

What's New

Tenders Awarded to Date
Construction Schedule

Project Documents and Information

Project History

Project Team

Building Committee
Decision Committee

Contact and Comments

Photo Gallery

Floor Plan Drawings - Ground Floor A, Ground Floor B, Second Floor A, Second Floor B

 

 


What’s New 

August 2010
    1) warm side foundations ongoing
    2) begin underground drains in basement of warm side
    3) pour street light bases in parking lot
    4) Pave north end of parking lot
    5) build walls for "olympia room"
    6) start masonry walls for dressing rooms
    7) begin steel erection of dressing rooms
    8) begin backfill of warm side. 

July 2010
    1) Formwork of warm side ongoing
    2) pave south end of parking lot and driveway.
    3) Complete hookups to restart arena.
    4) install and upgrade storm system for north end of parking lot
    5) install piping for parking lot lights
    6) prep and grade north end of parking lot for asphalt
    7) pour curbs and sidewalks at north end of parking lot 

June 2010
    1) Shoring of hill at northwest corner
    2) complete reinforcement of existing roof structure, and finish painting
    3) complete sprinkler rough-in of arena
    4) underground drains...cold side
    5) Site service: remove all parking lots @ home building centre, dig new retention ponds, install underground piping for storm system, grade prep parking lots and driveway.
    6) set up temporary change rooms
    7) install low -e ceiling in arena
    8) completion of foundation excavation in pool areas 
  
9) build hoarding wall at north end of arena and make weather tight
    10) install dewatering system
    11) Begin formwork @ warm side
    12) Install new sewer service to project
    13) begin sidewalks and curbs for south parking lot  

May 2010
    1) Continue excavation of cold side foundation
    2) Continue with forming, rebar, and pouring of foundations cold side
    3) Continue with reinforcement of existing structure
    4) demo at Home Building centre
    5) mobilize site services contractor, and begin removing retention pond
    6) Begin painting reinforced roof structure
    7) Begin rough in of sprinkler system in arena
    8) mobilize plumbers and begin underground drains on cold side
    9) Begin excavation of pool (warm) side  

April 2010
    1) Reinforce existing arena structure
    2) Build temporary wall on east side of arena
    3) Demolition of dressing rooms and TFA
    4) Begin excavation of new dressing room areas 
    5) Begin footings for dressing rooms 

 

March 2010
    1) Remove arena stuff
    2) Asbestos abatement
    3) Disconnect services
    4) Locate all existing services on the property
    5) Build temporary wall on east side
    6) Mobilize welders for reinforcement of existing roof
    7) Mobilize demolition crew and fence

 

Sample Project Sign revealed showing concept of final bulding.

 

Tender Packages are issued.  The following list of Tender Packages have been issued.  As the Tenders are awarded, we will update the web site.

 

Package #1 - Issued for Demolition -February 4, 2010

Package #2 - Issued for Steel Reinforcing - February 11, 2010

Package #3 - Issued for Foundation - February 15, 2010

Package #4- Issued for Site Works package - February 22, 2010

Package #5 - Issued for Sprinkler System -February 25, 2010

Package #6 - Issued for Primary Steel - February 25, 2010

Package #7 - Issued for Ice Resurfacing Tender - March 4, 2010

 

February 2010 - Pre-Qualification Package for sub trades and services posted on Town web site,  Gravenhurst Banner and Daily Commercial News. 

 

January 2010 - Decision Committee Terms of Reference approved.

 

December 2009 - Committee directs CS&P Architects to proceed to Design Development and Contract Documents.

 

December 15, 2009 - Report to Council summarizing public comments received at Public Open House on November 30, 2009.  Please note a copy of the Report is available here!

 

November 30, 2009 -A Stakeholders Meeting and a Public Open House were held in order for CS & P Architects to present the schematic design drawings to date.  Also Dalton Company invited any trade vendors to submit their names to be put on list for construction suppliers.  Public Comments were also received.

October 20, 2009 Simcoe Muskoka YMCA will be the provider of services for the new Aquatic Facility & Fitness Centre.  Resolution passed at Committee of the Whole meeting.

 


Tenders Awarded To date are as follows: 

Demolition Tender - awarded to Greenspoon Specialty Contracting , Brampton, Ontario

Arena Structural Reinforcing Tender - awarded to Paradise Steel

Sprinkler Fire Protection Tender - awarded to Edwards Sprinkler, Barrie, Ontario
Precast Concrete Structural Floor Tender - awarded to Coreslab Structures, Dundas, Ontario

Metal Decking Tender - awarded to Vixman Construction Ltd, Milton, Ontario

Phase 1 Foundation - Reinforcing Steel - awarded to Salit Steel, Grimsby, Ontario

Phase 1 Foundation - Concrete Formwork - awarded to Beehive Construction, Mississauga, Ontario

Phase 1 Foundation - Supply of Concrete - awarded to Lafarge Concrete, Bracebridge, Ontario

Phase 1 Foundation - Excavation & backfill - awarded to Corbett Wrecking, Dunnville + Coon Bros., Gravenhurst (fill only)

Phase 1 Foundation - Masonry - awarded to Fox Masonry Corp Barrie, Ontario

Structural Steel - was originally awarded to Nor Weld Orillia,  but they could not meet deadlines, so the tender has now been awarded to Benson Steel.

Survey work - T A  Bunker,  Gravenhurst, Ontario

Tree Removal on site - Davey Tree Service, Orillia, Ontario

Elevators - awarded to Schindler Elevator Corp, Scarborough, Ontario

Below Grade Plumbing - awarded to Georgian Triangle Plumbing, Collingwood, Ontario

Site Dewatering - awarded to Atlas Dewatering, Concord, Ontario

Site Works - awarded to Arnott Construction, Midhurst, Ontario

Shoring Tender - awarded to Anchor Shoring & Caissons Ltd - Toronto, Ontario

Rebar - Part 2 Foundation - awarded to Salit Steel, Grimsby, Ontario

Roof Top Unit (part) - pool dehumidification unit - awarded to HTS Egineering, North York, Ontario

Masonry (Phase 2) - awarded to Fox Masonry, Barrie, Ontario

Painting of Trusses - awarded to Inter-Provincial Ltd, Pickering, Ontario

Electrical - Site & Ice Resurface room Lighting - awarded to Wallwin Electric, Barrie, Ontario

Foundation (phase 2) - excavation & backfilling - awarded to Arnott Construction

Phase 2 Foundation - Concrete Formwork - awarded to Chemello Contracting - Brampton, Ontario

Press Steel -Screens & Hollow Metal Doors -awarded to Trillium Architectural Products  - Toronto, Ontario

Building Envelope Masonry - awarded  to Squire Masonry Ltd  - Cookstown, Ontario

Placing & Finishing of Concrete - awarded to Marrick Floor Co Ltd

Waterproofing - awarded to Aqua North - Ajax, Ontario

Roofing & Metal Flashing - awarded to Blanchfield Roofing - North Bay, Ontario

Mechanical - Main Building - Plumbing - awarded to Georgian Triangle Plumbing - Collingwood, Ontario

Electrical - Main Building - awarded to Wallwin Electrical - Barrie, Ontario
Metal Fabrication - awarded to Hours Welding & Fabrication  Ltd - Scarborough , Ontario

Curtain Wall, Aluminum Windows, Glass & Glazing - awarded to Barrie Metro Glass
Exterior Metal Cladding & Roofing for building and canopies - awarded to Titan Metals  - Loretto, Ontario

Under Pool   slabs & sub drainage - Scope of Work - Georgian Triangle Plumbing - Collingwood, Ontario

Overhead & Rolling Steel Doors - awarded to Northern's Own Garage Door Store - Orillia, Ontario

Folding Panel Partitions - awarded to Extreme Partitions - Etobicoke, Ontario

Gymnasium Equipment & Divider Curtain - awarded to Gymnasium & Health Equipment - Markham, Ontario

Food Services Equipment - awarded to European Hotel & Restaurant Imports - Toronto, Ontario

Pool Equipment - awarded to Acapulco Pools Ltd - Kitchener, Ontario

Gym Wood floor & Group exercise sprung floor - scope of work - awarded to Barwood Flooring  -  Toronto, Ontario

Spray Fireproofing & Intumescent Paint - scope of work - awarded to Firetherm Solutions Inc  -  Markham, Ontario

Supply of Wood Doors - awarded to Commercial Doors & Hardware - Weston, Ontario

 

top 


Construction Schedule

More information to come on the Construction Schedule.

Activity Target
Procurement of Architectural Consulting TeamSeptember 2009 
Procurement of Construction Management Team  October 2009
Procurement of Design DrawingsOctober 2009
Schematic Design DevelopmentOctober to December 2009
Construction DrawingsDecember 2009 to February 2010
TenderingFebruary 2010 
Construction StartMarch 2010
Substantial CompletionMarch 2011

top 


Pre Qualification

Pre-Qualification Package - Information Letter - Form


Project History 
 
June 2009 - Building Canada Fund Approval  

September 2009 - C S & P Architects named as the Lead Architects for the Project,  Maureen O’Shaughnessy and Craig Goodman; Project Architects  

October 2009 - The Dalton Company named as the Construction Management Company  

October 2009 - Simcoe Muskoka YMCA named as the Service Provider (Operators) of the Aquatic/Fitness and Wellness Centre of the Project  

October 2009 - The Building Committee named as the Advisory Group providing input into the design of the project.   

October 2009 - The Building Committee’s Term of Reference approved.

 

November 2009 – Stakeholders Meeting and Public Open House held.

 

 

December 2009 - CS&P Architects directed to proceed to Design  Development and contract document state.

 

January 2010 - Decision Committee Terms of Reference approved.

 

February 2010 - Pre-qualification package for sub trades and services closes on February 10, 2010.

 

March 2010 - Demolition to Begin on Project

top 


Project Team

Town of Gravenhurst

C S & P Architects

Dalton Company

Simcoe Muskoka YMCA

top 


Building Committee 

Building Committee Members are: 

Environmental Committee Member Ralph Culham

Accessibility Committee Member Judy Ring & Frank MacLaughlin as an alternate member

Gravenhurst Children’s Place & Muskoka Family Focus Tanya Martin and Jennifer Purkis

Seniors’ Centre Building Garnet Schenk

Gravenhurst Minor Hockey Association Daniel Rolfe

Simcoe Muskoka YMCA Representative David Grass

Dalton Company Representatives Randy Dalton & Ravi Rajpal

C S & P Architects Maureen O’Shaughnessy & Craig Goodman

Town of Gravenhurst Council Members – Mayor John Klinck, Councilor Cairns, Councilor Guerriero, Councilor Wilson

Town of Gravenhurst Staff Members – Manager of Development Services Nick Popovich, Building Department Bobbi Lovering, Treasury Department Janice LePage, Community Services Arena Operator Rick Larocque, and Manager of Recreation, Community Services and Centennial Centre Operations Debbie Broderick.

Date Document 
October 22, 2009   Building Committee Minutes
November 5, 2009Building Committee Minutes
November 19, 2009 

Building Committee Minutes

December 17, 2009Building Committee Minutes
January 7, 2010Building Committee Minutes
January 15, 2010Building Committee Minutes
January 19, 2010Update Report to Council 

top 


Decision Committee

 

A Decision Committee was formed, as per the Terms of Reference, and the members are as follows:

 

Mayor John Klinck

Councillor Lou Guerriero - Chair

Councillor Sandy Cairns

Councillor Tracey Wilson

Janice Lepage - Town of Gravenhurst -  Treasury Dept.

Davie Eidsness - Town of Gravenhurst - Chief Building Official

Debbie Broderick - Town of Gravenhurst - Manager of Recreation, Community  Services & Centennial Centre Operations

Maureen O'Shaughnessy - CS&P Architects

Craig Goodman - CS&P Architects

Ravi Rajpal - Dalton Construction Co

Len Beintema, Dalton Construction Co

David Grass - YMCA

Paul Robinson, YMCA

Rick Larocque - Town of Gravenhurst - Centennial Centre Recreation Service Operator

 

January 19, 2010   Terms of Reference
January 22, 2010 Decision Committee Minutes
January 28, 2010 Decision Committee Minutes
February 4, 2010 Decision Committee Minutes
February 11, 2010 Decision Committee Minutes
February 18, 2010 Decision Committee Minutes
February 25, 2010 Decision Committee Minutes
March 11, 2010 Decision Committee Minutes
March 19, 2010 Decison Committee Minutes
March 25, 2010 Decision Committee Minutes
April 8, 2010 Decision Committee Minutes
May 6, 2010 Decision Committee Minutes
June 3, 2010 Decision Committee Minutes